    The project involves the construction of a hotel building comprising 3 basement levels, a ground floor, a mezzanine floor and 14 additional floors.

HVAC System Description:

  • Image

    The HVAC system in the building is a central air condition system (chilled water cooling system). Each room served by one FCU which controlled by dynamic balancing valve. The system having one central treated fresh air to achieve the required air change value in each room. All exhaust air toilets are extracted from the building through one central heat recovery unit. The heat recovery unit used as apre-cooling stage for the fresh air system.

  • Image

    The HVAC system includes the following items: - 181 FCU's - 06 AHU's - 30 FANS - 02 FAHU - 03 PUMPS - 03 CHILLERS - 219 VALVES

GTC scope of work:

  • Image

    Testing and balancing for all HVAC system

  • Image

    Handling the system to the client

Contractor:

  • Image

    AL MOAYED

Imgs PROJECT IMAGES

Project