Imgs COAST GUARD BASE At DAAYEN

Building Nature:

  • Image

    The base at Simaismah, north of Doha, includes general headquarters, a shooting range, workshops, offices, residential accommodation, leisure facilities, a training area and a mosque.

  • Image

    The project consists of 26 buildings.

HVAC System Description:

  • Image

    The HVAC system in this project is a central air condition system (chilled water cooling system). Each FCU and AHU controlled by balancing valve (dynamic valve) with an actuator.

  • Image

    Each building has one central treated fresh air to achieve the required air change value in each room.

  • Image

    The HVAC system includes the following items: - 64 AHU - 49 FAHU - 1765 FCU - 152 FAN - 06 CHILLERS - 06 COOLING TOWERS - 50 Pump - 15 HEX - 14 CRAC - 7 PU - 61 VAV Boxes

GTC scope of work:

  • Image

    Testing and balancing for all HVAC system

  • Image

    Handling the system to the client

Contractor:

  • Image

    GET

Imgs PROJECT IMAGES

Project