Imgs EZDAN OASIS (HYPER MARKET & ADMIN DUILDING)

Building Nature:

  • Image

    The project consists of two buildings hypermarket and admin building; the hypermarket building consists of two floors containing cold storages rooms, vegetable refrigerator, and other applications. The admin building consists of three floors containing commercial offices with different areas.

HVAC System Description:

  • Image

    The HVAC system in hypermarket building is a central air condition system (chilled water cooling system). Each FCU and AHU controlled by balancing valve (static valve) with an actuator.

  • Image

    The HVAC system in admin building is package unit’s system type.

  • Image

    The system having one central treated fresh air to achieve the required air change value in each room.

  • Image

    The smoke management system consists smoke exhaust and make- up fresh air fans

  • Image

    All exhaust air toilets are extracted from the building through exhaust fans.

  • Image

    The HVAC system includes the following items: - 11 AHU - 36 Package units - 75 FAN - 04 FCU - 05 Pump - 02 Chiller

GTC scope of work:

  • Image

    Testing and balancing for all HVAC system

  • Image

    Handling over the system to the client

Contractor:

  • Image

    AL MOAYYED

Imgs PROJECT IMAGES

Project